Data Center · Cooling · Power · Solar · IT Infrastructure United Arab Emirates

Solutions — 02 / 08

Data Center Cooling

Precision cooling engineered for uptime — from room-level cooling to targeted in-row systems with optimized airflow.

5–200kW
Cooling Capacity Range
N+1
Redundancy Available
30%+
Typical Efficiency Gain
Add image: assets/images/solutions/data-center-cooling.jpg

The Challenge

Why this matters

Cooling is usually the largest single line item in a data hall's operating cost — and the most common cause of thermal throttling when it's undersized or poorly distributed. The fix isn't always more capacity; it's better airflow management.

Core Capabilities

What's included

Precision Cooling Units

CRAC/CRAH systems sized to actual heat load, not nameplate server ratings.

In-Row Cooling

Targeted cooling placed at the rack row for high-density deployments where room-level cooling can't keep up.

Airflow Containment

Hot/cold aisle separation that stops mixing before it happens, cutting wasted cooling capacity.

Redundancy Design

N, N+1, and 2N configurations specified to match your facility's actual criticality tier.

Monitoring & Optimization

Temperature mapping and airflow analysis to catch inefficiencies after commissioning, not just at handover.

Specifications

Technical reference

Unit typesPrecision, in-row, CRAC/CRAH
Capacity range5 kW – 200 kW per unit
Redundancy configsN, N+1, 2N
Control systemsSmart temperature & humidity control
AirflowHot/cold aisle containment compatible

How We Deliver

Our process

01

Assess

Thermal load and airflow audit of the existing or planned space.

02

Design

Cooling architecture and redundancy plan matched to criticality.

03

Deploy

Unit installation and containment fit-out.

04

Support

Monitoring, efficiency tuning, and ongoing maintenance.

Applications

Who this serves

Data Centers

Colocation and enterprise halls at any density.

Telecom

Central offices with 24/7 thermal criticality.

Hospitals

Cooling for critical care IT and medical equipment rooms.

Commercial Buildings

Server rooms in office environments without dedicated data hall design.

Common Questions

FAQ

How do I know what cooling capacity I actually need?

We run a thermal load audit based on your actual rack power draw, not estimated nameplate ratings — this usually reveals you need less capacity than assumed.

Can cooling be added to an existing room without a full redesign?

Yes, in-row units are often the fastest way to add targeted capacity without touching the room's existing systems.

Do you offer maintenance contracts after installation?

Yes, ongoing maintenance and support is available as part of the installed solution.

Explore More

Related Solutions

01

Data Center Infrastructure

End-to-end infrastructure planning and delivery for new builds and upgrades — from design support through to structured cabling and live monitoring.

Learn More →
03

UPS & Power Protection

Power continuity solutions sized for critical load — online, modular, and three-phase systems with full backup design.

Learn More →
04

Batteries & Energy Storage

Backup runtime engineered to match load and criticality, with lead-acid and lithium options and full cabinet integration.

Learn More →

Get In Touch

Build Reliable Infrastructure With Green Wave

Contact our team for a Data Center Cooling requirement, from design through installation and support.