End-to-end infrastructure planning and delivery for new builds and upgrades — from design support through to structured cabling and live monitoring.
The Challenge
A data hall is only as reliable as its weakest physical layer. Undersized containment, poorly planned cable routing, and unmonitored power distribution are the quiet causes of downtime long before a server ever fails. Facilities need infrastructure that's specified against actual load — not assumed capacity.
Core Capabilities
Hot-aisle/cold-aisle containment planning that matches airflow to rack density, reducing cooling load before a single cooling unit is installed.
Copper and fiber cabling architecture that stays serviceable as the environment scales, labeled and documented to reduce future troubleshooting time.
PDU and busway planning sized to circuit-level load, with clear separation between A/B feeds for redundancy.
Temperature, humidity, and airflow sensors integrated into a single monitoring layer, with alerting before conditions become critical.
Rack and power capacity modeling so growth doesn't outrun the room.
Specifications
| Rack heights | 42U, 45U & custom |
| Containment types | Hot-aisle & cold-aisle |
| Cabling standards | Cat6A copper, OM4/OS2 fiber |
| PDU options | Basic, metered, switched |
| Monitoring | DCIM-compatible sensor integration |
How We Deliver
Site survey and load audit against current and planned capacity.
Rack layout, containment, and cabling architecture specified to spec.
Installation and containment fit-out under a single accountable scope.
Monitoring handover, documentation, and ongoing technical support.
Applications
Colocation and enterprise data halls requiring rack-level accountability.
Central offices and POPs where cabling discipline determines uptime.
Facilities where physical infrastructure audits are part of compliance.
Server rooms scaling from a handful of racks to a full deployment.
Common Questions
Both. Most of our infrastructure projects are upgrades to existing rooms — we assess what's already there before specifying anything new.
Both. Racks and containment can be supplied and installed together, or installed using equipment you already have on hand.
A single-room fit-out (10-20 racks) typically runs 3-6 weeks from design sign-off to handover, depending on cabling scope.
Explore More
Precision cooling engineered for uptime — from room-level cooling to targeted in-row systems with optimized airflow.
Learn More →Power continuity solutions sized for critical load — online, modular, and three-phase systems with full backup design.
Learn More →Backup runtime engineered to match load and criticality, with lead-acid and lithium options and full cabinet integration.
Learn More →Get In Touch
Contact our team for a Data Center Infrastructure requirement, from design through installation and support.